Enbridge : Henderson Creek (Subcontracted to Triple J Pipelines)

http://www.rbsomerville.com/files/2022/01/21703-Enbridge-Triple-J-Henderson-Creek-e1642168468578.jpg
Job Number: 21703
Role: Subcontractor
Engineer:
Primary Work Type: Pipeline Construction
Other Work Type: Horizontal Directional Drilling
Status: Completed
Location: Alberta
Duration:: Jul-2021 – Aug-2021
Value:
Contract Type: Lump Sum

The scope for Henderson Creek Crossing was to install a new 1018m NPS26 Pipeline across Henderson Creek near Bonanza, Alberta. The crossing was executed using an American Augers DD1100 with an exit side winch on exit during reaming operations.  Pilot was completed with an 8-inch mud motor and 12 ¼ milled tooth bid utilizing a wireless guidance technology.  Reaming was completed using a 30inch and 38inch milled tooth reamers. Pull back activities included the installation of buoyancy control measures.