Innes Road Replacement Project

http://www.rbsomerville.com/files/2014/09/IMG_10412.jpg
Client: Enbridge Gas
Job Number: 14 007
Role: Prime Contractor
Engineer:
Primary Work Type: Pipeline Construction
Other Work Type: HDD
Status:
Location: Ontario
Duration:: Apr-2014 – Sep-2014
Value:
Contract Type: Lump Sum

Somerville was contracted to decommission and replace an existing NPS 8 with NPS 12 pipeline. The work was completed in three phases and included 580m of horizontal directional drilling of NPS12 steel pipe under Highway 406.  The new NPS 12 line serves as a critical connection between two of the major pipeline networks in Ottawa.