Line 9 Re-route (Don River)

http://www.rbsomerville.com/files/2017/04/DSC00165.jpg
Job Number: 13022
Role:
Engineer:
Primary Work Type: Pipeline Installation
Other Work Type: Horizontal Directional Drilling
Status:
Location: Ontario
Duration:: Sep-2013 – Feb-2014
Value:
Contract Type: Lump Sum

The primary work involved rerouting a section of Enbridge Pipelines Line 9, from approximately KP 3081.35 to KP 3082.07 in Toronto, Ontario.   This section of Line 9 is a 30 inch (762 mm) OD pipeline located on the southern edge of the Hydro One corridor between the Luton Gate and Pineway Blvd.   This project involved Driectional Drilling approximately 635m of pipe under the Don River within 0m to 5m of the existing line, cutting out approximately 70m compromised pipe and restoration of unstable soils along the river bank.   Scope included the installation of 30″ valve on Line 9 including acuator and controls.