Uncategorized

South West Edmonton Connector

http://www.rbsomerville.com/files/2017/04/FullSizeRender-MB-.jpg
Job Number: 16015
Role: General
Engineer:
Primary Work Type: Pipeline
Other Work Type: Horizontal Directional Drilling
Status:
Location: Alberta
Duration:: Aug-2016 – Mar-2017
Value:
Contract Type: Lump Sum

Installation of approximately 20.8km of NPS 20 and 2km of NPS 12 in the South West Edmonton Transportation Utility Corridor (TUC). The pipeline was installed within a 10m ROW with 20m adjacent work space.  There were numerous HDD crossings including the North Saskatchewan River, White Mud Creek and the Anthony Henday at multiple locations.