Client: ATCO Gas
Owner: ATCO Gas
Job Number: 14507
Role: Prime Contractor
Engineer:
Primary Work Type: Pipeline
Other Work Type:
Status: Completed
Location: Alberta
Duration:: Aug-2014 – Nov-2014
Value:
Contract Type: Unit Price

Project is to replace existing steel mains and services in the Callingwood area of Edmonton. Area is primarily residential with large townhouse and condominium complexes, and some commercial. Project involves installation of 2,630m of PE mains up to 2″, 400m of PE mains between 3″ and 4″, 810m of 6″ PE mains, with 501 services. New mains and services will primarily be installed by directional drilling. Also involved with the replacement of service lines is to move any existing inside gas meter to the outside of the building. Inside gas meter work will consist of primarily residential houses with 200 series meters, and commercial meters up to 2M rotary meters.