Projects

page 1 (out of 24)Next >Last »

Projects

Somerville has remained in business for over sixty years by consistently executing projects. We have helped to build many strong communities across this country, one project at a time, and in fact due to our collective and respective efforts have helped to build a strong country. We understand mega-projects these days require a distinct level of expertise and experience, which we have, but we are quite flexible – and friendly – too.

Our crews are admired for their professionalism, and their personal high regard for safety and the environment, whether completing projects both large and small. While on this page you will always see an updated selection of our most recent projects. Dig deeper. Within our specifically constructed project vault, we hope you’ll enjoy perusing our impeccable history, especially when viewed across a truly immense spectrum of activity.

West Calgary Connector (WCC)

http://www.rbsomerville.com/files/2017/09/IMG_3447-2-e1506520501364.jpg

Client: ATCO Pipelines Location: Alberta Status: Underway Duration: Jun-2017 to Dec-2017

The scope for this project included the installation of approximately 19km of NPS 20 for the Urban Pipeline Replacement Project – West Calgary Connector.  The pipeline will be installed generally with …  Visit project ›

Dead Horse Creek

http://www.rbsomerville.com/files/2017/09/IMG_1661-MG-1.jpg

Client: Enbridge Pipelines Location: Manitoba Status: Underway Duration: Aug-2017 to Nov-2017

Somerville was contracted to excavate four existing pipelines on a steep hill, through a fish bearing creek. Somerville had to isolate the creek for the width of the pipeline ROW and pump the river wa …  Visit project ›

TransCanada – NPS 48 Launcher Installation

http://www.rbsomerville.com/files/2017/10/IMG_1033.jpg

Client: TransCanada Pipelines Location: Manitoba Status: Complete Duration: May-2017 to Jul-2017

This project involved the installation of a new 56” launcher on Trans Canada’s NPS 48″ 400 series mainline at MLV 401 in Ile des Chenes, Manitoba.  Work included expanding the existing station to inco …  Visit project ›

Line 10 Replacement Project – HDD

http://www.rbsomerville.com/files/2017/09/IMG_2673-DK.jpg

Client: Enbridge Pipelines Location: Ontario Status: Underway Duration: Aug-2017 to Oct-2017

Construction of an NPS 20 line for the Line 10 Replacement Project which will replace the existing NPS 12 line over 36.2 km. The Project consists of a NPS 20 (508.0 mm O.D.) pipeline from the Westover …  Visit project ›

ATCO Gas – Urban Pipe Replacement (UPR) – East Airport Phase 2

http://www.rbsomerville.com/files/2017/10/IMG_4174.jpg

Client: ATCO Gas Location: Alberta Status: Complete Duration: Apr-2016 to Jun-2016

Approved by the Alberta Utilities Commission in January 2014, the Urban Pipeline Replacement (UPR) Program will see the high-pressure natural gas transmission pipelines in Edmonton and Calgary neighbo …  Visit project ›

ATCO Gas – Steel Mains Replacement (SMR) Program – Belgravia 2

http://www.rbsomerville.com/files/2017/10/IMG_5704.jpg

Client: ATCO Gas Location: Ontario Status: Complete Duration: Apr-2017 to Jun-2017

Project included replacing existing steel mains and services in the Belgravia 2 area of Edmonton. Area is primarily residential and some commercial buildings. Project involved installation of 5,800m o …  Visit project ›

ATCO Gas – Urban Pipeline Replacement (UPR) – Edmonton

http://www.rbsomerville.com/files/2017/10/IMG_5733.jpg

Client: ATCO Gas Location: Alberta Status: Complete Duration: Apr-2017 to Oct-2017

Approved by the Alberta Utilities Commission in January 2014, the Urban Pipeline Replacement (UPR) Program will see the high-pressure natural gas transmission pipelines in Edmonton and Calgary neighbo …  Visit project ›

South West Edmonton Connector

http://www.rbsomerville.com/files/2017/04/FullSizeRender-MB-.jpg

Client: ATCO Pipelines Location: Alberta Status: Duration: Aug-2016 to Mar-2017

Installation of approximately 20.8km of NPS 20 and 2km of NPS 12 in the South West Edmonton Transportation Utility Corridor (TUC). The pipeline was installed within a 10m ROW with 20m adjacent work sp …  Visit project ›

Puce River Crossing – Panhandle Project NPS 20

http://www.rbsomerville.com/files/2017/04/DJI_0026.jpg

Client: Aecon Utilities Location: Ontario Status: Duration: Jun-2016 to Oct-2016

The installation of 815m of NPS 20 was successfully completed using our American Augers DD440T HDD. The pilot was completed using a 12″ duckbill style jetting assembly utilizing a Paratrack 2 wireline …  Visit project ›

Enbridge Line 11 NPS 20 Replacement – Westover Station HDD

http://www.rbsomerville.com/files/2017/04/IMG_20141213_140241.jpg

Client: Link-Line Location: Ontario Status: Duration: Oct-2014 to Dec-2014

For this project, we setup the DD185 drill inside Westover station to drill a 560m bore across a section of the Beverly Swamp, 25m deep thru solid bedrock and limestone using wireline steering and a 9 …  Visit project ›