Somerville has remained in business for over fifty years by consistently executing projects. We have helped to build many strong communities across this country, one project at a time, and in fact due to our collective and respective efforts have helped to build a strong country. We understand mega-projects these days require a distinct level of expertise and experience, which we have, but we are quite flexible – and friendly – too.

Our crews are admired for their professionalism, and their personal high regard for safety and the environment, whether completing projects both large and small. While on this page you will always see an updated selection of our most recent projects. Dig deeper. Within our specifically constructed project vault, we hope you’ll enjoy perusing our impeccable history, especially when viewed across a truly immense spectrum of activity.

Design, Supply and Install 5.5 Kilometres 230 KV Cable Circuits

http://www.rbsomerville.com/files/2014/04/142.jpg

Client: Black and McDonald Ltd. Location: Ontario Status: In Progress Duration: Sep-2013 to Oct-2014

Work for this contract included replacement of 2 complete 230 KV circuits of high voltage cable (230 KV) in Toronto, between the Riverside Transformer Station and the Strachan Transformer Station – a distance of some 5.5 kilometres.  Visit project ›

Red Deer – AltaLink 138 kV 80L Underground Transmission

http://www.rbsomerville.com/files/2016/08/PA050226-1.jpg

Client: EHV Power Location: Alberta Status: Duration: Jan-2015 to Nov-2015

The AltaLink 138kV 80L underground transmission project formed an important part of 18 separate developments designed to strengthen the electrical grid in the greater Red Deer, Alberta area. The ductb …  Visit project ›

Trenching and Duct Bank Services – As Required – Enersource Hydro Mississauga

http://www.rbsomerville.com/files/2014/04/IMG_0575.jpg

Client: Enersource Hydro Mississauga Inc. Location: Ontario Status: In Progress Duration: Apr-2013 to Mar-2016

This is a “General Contract” on a “as required ” basis – for trenching and duct bank construction for a term of 3 years, with an optional 2 year extension.  Visit project ›

Ottawa Reinforcement

http://www.rbsomerville.com/files/2017/03/Airport-4.jpg

Client: Enbridge Gas Distribution Location: Status: Duration: Aug-2013 to Nov-2013

Robert B. Somerville was contracted to complete 3 directional drills as part of a new NPS 24 pipeline being constructed in Ottawa. Somerville utilized the DD185 to complete a 300 meter crossing under …  Visit project ›

Stoney Trail Crossing

http://www.rbsomerville.com/files/2016/01/SAB_1543.jpg

Client: ENMAX Power Corporation Location: Alberta Status: Completed Duration: Oct-2013 to Feb-2014

Robert B. Somerville Co. Limited (Somerville) was contracted by ENMAX to construct a trenchless crossing traversing Stoney Trail in the north east section of Calgary. The crossing itself was accomplis …  Visit project ›

Transformer Vault Modifications – 21 Queen St East

http://www.rbsomerville.com/files/2014/04/43_projectPhoto_original.jpg

Client: Hydro One Brampton Networks Inc. Location: Ontario Status: Completed Duration: Apr-2012 to Jun-2012

This work contract includes modifications to a large submersible transformer vault located in a sidewalk in downtown Brampton.  Visit project ›

Puce River Crossing – Panhandle Project NPS 20

http://www.rbsomerville.com/files/2017/04/DJI_0026.jpg

Client: Aecon Utilities Location: Ontario Status: Duration: Jun-2016 to Oct-2016

The installation of 815m of NPS 20 was successfully completed using our American Augers DD440T HDD. The pilot was completed using a 12″ duckbill style jetting assembly utilizing a Paratrack 2 wireline …  Visit project ›

Newmarket Old Town Hall – 460 Botsford St

http://www.rbsomerville.com/files/2014/04/IMG_0714.jpg

Client: Newmarket - Tay Power Distribution Ltd. Location: Ontario Status: Completed Duration: Mar-2013 to Mar-2013

Duct Bank relocation in advance of building expansion, to allow Newmarket Hydro to remove existing cables.  Visit project ›

Enbridge Line 11 NPS 20 Replacement – Westover Station HDD

http://www.rbsomerville.com/files/2017/04/IMG_20141213_140241.jpg

Client: Link-Line Location: Ontario Status: Duration: Oct-2014 to Dec-2014

For this project, we setup the DD185 drill inside Westover station to drill a 560m bore across a section of the Beverly Swamp, 25m deep thru solid bedrock and limestone using wireline steering and a 9 …  Visit project ›

South West Edmonton Connector

http://www.rbsomerville.com/files/2017/04/FullSizeRender-MB-.jpg

Client: ATCO Pipelines Location: Alberta Status: Duration: Aug-2016 to Mar-2017

Installation of approximately 20.8km of NPS 20 and 2km of NPS 12 in the South West Edmonton Transportation Utility Corridor (TUC). The pipeline was installed within a 10m ROW with 20m adjacent work sp …  Visit project ›