The project is to replace existing plastic mains and services in the rural Ellerslie Rd area southeast of Edmonton. This includes the abandonment, relocation, and installation of mains, services and meters, through trenchless installation including meter placement to an outside appropriate location. Also included, is exterior and interior piping, fittings, meters, regulators, coring and sealing of existing holes as required to relocate meter sets. Cleanup and restoration to take place to same or better condition. The area is primarily residential and involves installation of 6,380m of PE mains, up to 2”, and 25 services. New mains and services will be primarily installed by directional drilling.
Pipeline
ATCO Gas - Plastic Mains Replacement Program (PMR) - Ellerslie Rd
Project Information
Client: ATCO Gas
Job Number: 22514
Work Type: Distribution Pipeline
Location: Edmonton, Alberta
Contract Type: Unit Price
Role: General
Status: Complete
Duration: 2022-08-23T04:00:00.0000000Z2022-10-11T04:00:00.0000000Z