Project scope includes installation of 1.1km of NPS 36 pipe with three HDB crossings in a very remote area, more than two hours from the nearest town. This project is executed in a challenging terrain where ice roads are built over muskeg. This project involves very deep excavations and the use of slide rail trench safety systems. Facility piping is included in the scope of work.