Client: Imperial Oil
Job Number: 20702-50
Role: Prime Contractor
Engineer:
Primary Work Type: Pipeline Construction
Other Work Type: Horizontal Directional Drilling
Status: Complete
Location: Ontario
Duration:: Mar-2021 – Mar-2021
Value:
Contract Type:

As part of the WAT-FIN NPS12 pipeline replacement program for Imperial Oil in Ontario, a 943m HDD crossing through 100m of overburden and then through a shale rock formation under a major creek and road was completed, with minimal disruption and on schedule. The use of a 12 1/4″ PDC bit on an 8″ mud motor while using wireline steering completed the pilot on target. A final reamed hole of 18″ using an HDX hole opener enabled the installation of the NPS 12 pipe with no issues.