601 Ormont - Fibre Optic Backbone Cable System The installation included approximately 40m of directional boring (under Barmac Drive), 15m of open cut excavation in sodded area, and 1 manhole(pull box). Robert B. Somerville provided the directional drilling services for the project. Site cleanup and commissioning followed.