Powerline Road to WPCP Trunk Watermain Extension This project included the installation of 700m of 20" HDPE by directional drill and approximately 450m of 16" PVC pipe by open cut to air release valve chambers. The scope also included tie-in to the existing watermain station, including swabbing, pressure testing, and chlorinating.
![](/rollup-images/1000//projects/7_projectPhoto_original.jpg)