Project is to replace existing steel mains and services in Allarco. Area is primarily rural residential. Project required the installation of 450m of 3/4" PE, 1,600m of 2" PE, and 15 services. New mains and services will primarily be installed by directional drilling. Also involved with the replacement of service lines is to move any existing inside gas meter to the outside of the building. Inside gas meter work will consist of primarily residential houses with 200 series meters.