This work was for the installation of anodes on the return bend/jumper portion of existing gas services to commercial buildings . Somerville was required to complete the metering to determine if an anode was required and when necessary to install an anode. This work was mainly in the downtown core of Edmonton and involved installing approximately 75 anodes in winter conditions.
![](/rollup-images/1000//projects/209_projectPhoto_original.jpg)