Project Information

Client: ATCO Gas
Job Number: 22519
Work Type: Distribution Pipeline
Location: Edmonton
Contract Type: Unit Price
Role: General
Status: Complete
Duration: 2022-10-24T04:00:00.0000000Z2022-11-29T05:00:00.0000000Z
Download PDF

The project is to replace existing plastic main and services in the rural area of Smithson Acres near Edmonton, Alberta. This includes the abandonment, relocation, and installation of mains, services and meters, through trenchless installation including meter placement to an outside appropriate location. Also included, is exterior and interior piping, fittings, meters, regulators, coring and sealing of existing holes as required to relocate meter sets. Cleanup and restoration to take place to same or better condition. The area is primarily residential and involves installation of 3400m of PE mains, up to 2”, and 25 services. New mains and services will be primarily installed by directional drilling.