Project is to install a new 12" gas distribution feeder pipeline along Meridian Street in the northeast part of Edmonton. Area is primarily rural, with the installation primarily in a boulevard. Project involves working in proximity to and crossing through several pipeline ROW's. There is a large ravine/creek crossing where the pipe will be installed by one continuous horizontal direction drill that is 430m long, utilizing a 220 size drill. Project involves installation of 880m of 12" PE and 430m of 12" Steel. PE pipe will be installed by open cut.
![](/rollup-images/1000//projects/21501-ATCO-IMG_0364.jpg)