ATCO Pipelines - Pembina-Keephills Transmission Line (PKTL)

Project Information

Client: ATCO Pipelines
Job Number: 19008
Work Type: Mainlnie Pipeline
Location: Alberta
Contract Type: Lump Sum
Role: Pipeline
Status: Complete
Download PDF
Construction of the Pembina-Keephills Transmission Project comprised of approximately 58.6km of NPS 30 pipe, 800m of NPS 24 pipe, and 200m of NPS 20 pipe. Construction included eleven (11) Horizontal Directional Drills for a total of 6,024m and installation of 4 Valve Assemblies (including one pig launcher and receiver).