The work carried out by Somerville was the supply and installation of 758m of concrete encased ductbank, and 1 electrical vault to facilitate the installation of 3-138kV and 3-240kV XLPE insulated cable circuits. This work was installed along the Elbow River located in Calgary Stampede Park in the SE quadrant of the City of Calgary.
![](/rollup-images/1000//projects/P8110095.jpg)