Expansion of the refueling system for the Deerfoot Cargo Facility at the Calgary airport. The scope of work included the installation and testing of the piping, jet fuel hydrants and connection into the existing fuel delivery system. The existing fuel system connection required flushing of the system and testing to verify system operational for fueling.
![](/rollup-images/1000//projects/Section-13.jpg)