Horizontal Directional Drilling

Enbridge : Henderson Creek (Subcontracted to Triple J Pipelines)

Project Information

Client: Triple J Pipelines
Job Number: 21703
Work Type: Heavy Rigs (100k & larger)
Location: Alberta
Contract Type: Lump Sum
Role: Subcontractor
Status: Complete
Download PDF

The scope for Henderson Creek Crossing was to install a new 1018m NPS26 Pipeline across Henderson Creek near Bonanza, Alberta. The crossing was executed using an American Augers DD1100 with an exit side winch on exit during reaming operations. Pilot was completed with an 8-inch mud motor and 12 milled tooth bid utilizing a wireless guidance technology. Reaming was completed using a 30inch and 38inch milled tooth reamers. Pull back activities included the installation of buoyancy control measures.