Enwave Eastern Expansion Project WIC & Corus Connection. This project included the supply and installation of 2 x 250mm HDPE and 2 x 150mm FRP Hot and Cold district energy piping. This project also included the supply and installation of an Air Release Valve Chamber and tie-in to the existing riser.
![](/rollup-images/1000//projects/11-Enwave-20-301.jpg)