Project is to install 5,487m of 4" PE gas main extension near Campbell River, BC. Project ties into an existing 4" PE distribution pressure pipe and is to be installed mostly alongside a county road and ending near the soon to be built Deerfield Station. Installation is primarily by directional drill and will include one sensitive salmon spawing 182m long river crossing.
![](/rollup-images/1000//projects/Project-Info-Sheet-18-535.jpg)