This project was for the installation of valves on existing steel and PE gas mains in both Lacombe and Olds Alberta. Lacome involved installing 1 6" PE valve, 8 steel valves up to 4". In Olds there were 6 PE valves up to 6" and 9 steel valves up to 4". Somerville was responsible for all aspects of the job from locates and excavation, to installing and performing the drill and stop and installing the valves, and all cleanup.


Pipeline
Isolation Valve Program - Red Deer Region
Project Information
Client: Atco Gas
Job Number: 10514
Work Type: Distribution Pipeline
Location: Alberta
Contract Type: UPC
Owner: Atco Gas
Role: General Contractor
Status: Completed