Infrastructure

King Road at Hwy # 400 - Interchange Upgrade

Project Information

Client: Bell Canada
Job Number: 09054
Work Type: Communications and Fibre Optics
Location: Ontario
Contract Type: UPC
Owner: Bell Canada
Role: General Contractor
Status: Completed
Download PDF
Interchange modifications at Hwy 400 planned for spring start. Bell work includes construction of 3 cast in place manholes, 528.0 trech metres of concrete encased duct banks, 211.0 trench metres of direct buried ducts, and 101.0 metres of duct installed by Directional Drill.