Interchange modifications at Hwy 400 planned for spring start. Bell work includes construction of 3 cast in place manholes, 528.0 trech metres of concrete encased duct banks, 211.0 trench metres of direct buried ducts, and 101.0 metres of duct installed by Directional Drill.
![](/rollup-images/1000//projects/42_projectPhoto_original.jpg)