Interchange modifications at Hwy 400 planned for spring start. Bell work includes construction of 3 cast in place manholes, 528.0 trech metres of concrete encased duct banks, 211.0 trench metres of direct buried ducts, and 101.0 metres of duct installed by Directional Drill.
Infrastructure
King Road at Hwy # 400 - Interchange Upgrade
Project Information
Client: Bell Canada
Job Number: 09054
Work Type: Communications and Fibre Optics
Location: Ontario
Contract Type: UPC
Owner: Bell Canada
Role: General Contractor
Status: Completed