Robert B. Somerville constructed approximately 4.5 km of NPS 20 steel pipeline with a maximum operating pressure of 1,440 psig (9 930 kPa). The Ladysmith Loop starts at EGD's Tecumseh Station and is used to deliver and take away gas, in a normal operating pressure range of between 300 -1340 psig (2 070 to 9 240 kPa), to and from the Ladysmith storage reservoir. The project is part of the Tecumseth Storage Enhancement Project
Pipeline
Ladysmith Loop Pipeline Project
Project Information
Client: Enbridge Gas Distribution
Job Number: 08012
Work Type: Mainlnie Pipeline
Location: Ontario
Contract Type: UPC
Owner: Enbridge Gas Distribution
Role: General Contractor
Status: Completed