Construction of an NPS 20 line for the Line 10 Replacement Project which will replace the existing NPS 12 line over 36.2 km. The Project consists of a NPS 20 (508.0 mm O.D.) pipeline from the Westover Terminal to the Nanticoke Junction in Ontario. The proposed pipeline will replace the existing line, and will transport crude oil. Somerville was engaged to complete two HDD crossings within a new Company ROW. The proposed HDD shall cross under the Copetown Woods Golf Course in a north to south alignment for a total drill length of 830 m. The second HDD shall cross under the Sheffield Rockton Complex in a north to south alignment for a total drill length of 654.1 m.
Horizontal Directional Drilling
Line 10 Replacement Project - HDD
Project Information
Client: Enbridge Pipelines
Job Number: 17021
Work Type: Heavy Rigs (100k & larger)
Location: Ontario
Contract Type: Lump Sum
Owner: Enbridge Pipelines
Role: Horizontal Directional Drilling
Status: Underway