The project involved the supply and installation of approximately 270 meters of 300 mm diameter High Density Polyethylene pipe. The pipeline was installed by directional drilling method. The pipeline new pipeline will serve as the sanitary sewer connection to the Lionhead Executive Estates subdivision.
