This project involved the replacement of 38m of NPS20, 38m of NPS24 and 38m of NPS30 for future road crossings over the pipelines. Each existing line was isolated, removed, new heavier wall pipe was tested and installed.
![](/rollup-images/1000//projects/22385 - TC Lunay Dr Crossing IMG_0004.jpg)
This project involved the replacement of 38m of NPS20, 38m of NPS24 and 38m of NPS30 for future road crossings over the pipelines. Each existing line was isolated, removed, new heavier wall pipe was tested and installed.