Pipeline

Mirabel Quebec Class Upgrade

Project Information

Client: TransCanada
Job Number: 15025
Work Type: Integrity & Maintenance
Location: Quebec
Contract Type: Cost Plus
Owner: TransCanada Pipelines
Role: General Contractor
Status: Completed
Download PDF
This project required the replacement of 1075m of 24" pipeline in an urban area. This presented challenges in that the pipeline needed to remain operational throughout the entire replacement. Stopple fittings and 24" bypasses were installed to ensure gas flow during construction activities.