Horizontal Directional Drilling

Nexen K1A HDD Project

Project Information

Client: Nexen
Job Number: 18029
Work Type: Heavy Rigs (100k & larger)
Location: Alberta
Contract Type: Unit Price
Owner: Nexen
Role: Prime Contractor
Status: Completed
Download PDF
Installed nine (9) NPS30 cased crossings for the Kinosis 1A (K1A) pipeline project between the Long Lake and K1 A Facility. HDD crossings were performed in the existing right of way in close proximity to existing BFW and PE lines. In addition to HDD, scope included engineering and design services, stringing, welding, NDE, coating and pull back activities.