Pipeline

North Central Corridor HDD

Project Information

Client: TC Energy
Job Number: 22013
Work Type: Integrity & Maintenance
Location: Alberta
Contract Type: Lump Sum
Role: Prime Contractor
Status: In Progress
Duration: 2021-11-15T05:00:00.0000000Z2023-03-30T04:00:00.0000000Z

The North Cental Corridor project required the replacement of the Wabasca River Crossing which included ~700m NPS36 HDD. Winter work was a necessity based on muskeg and poor ground conditions in warmer months. This high use line could not be completed with an outage. Instead stopple bypass was utilized for final tie-ins.