The Poundmaker Substation, 240/25kV, 2x75MVA facility is located at 18944-105 Ave, NW, Edmonton, Alberta. The Scope of Work consists of construction of Concrete Encased Ductlines, Manhole (MH) installations, and Access Road construction, from the south substation boundary to Stony Plain Road. The Work will be undertaken within Owners 240kV Right-of-Way (the Right-of-Way) and the adjacent Transportation Utility Corridor (TUC) Lands. Robert B. Somerville constructed approximately 800m of 9 & 12-way concrete encased ductbanks and installed 5 precast manholes.