Powerline Road to WPCP Trunk Watermain Extension This project included the installation of 700m of 20" HDPE by directional drill and approximately 450m of 16" PVC pipe by open cut to air release valve chambers. The scope also included tie-in to the existing watermain station, including swabbing, pressure testing, and chlorinating.
Infrastructure
Powerline Rd/WPCP Trunk Watermain Ext.
Project Information
Client: Town of Wasaga Beach
Job Number: 08015
Work Type: Water & Sewer
Location: Ontario
Contract Type: UPC
Owner: Town of Wasaga Beach
Role: General Contractor
Status: Completed