Project is to replace existing steel mains and services in the Capital Region East of Edmonton. The area is primarily rural residential. These projects required the installation of 3,210m of up to 2" PE, and 63 services. New mains and services will primarily be installed by directional drilling. Also involved with the replacement of service lines is to move any existing inside gas meter to the outside of the building. Inside gas meter work will consist of primarily residential houses with 200 series meters.