Rural Mains Replacement Project Red Deer The project involved the replacement gas mains, primarily PVC lines, and services in area of Red Deer, Alberta. Project involved installation of 17 km of PE mains ranging from 2" to 4", and approximately 30 rural services. The primarily method for instalaltion of mains was by directional drill and vibratory plow through, farm fields, crossing lease roads and water bodies. The scope also inculded with the replacement of service lines required to move any existing inside gas meter to the outside of the building. Inside gas meter work consisted of primarily farm houses with 200 series meters.
Pipeline
Rural Mains Replacement - Red Deer
Project Information
Client: Atco Gas
Job Number: 11508
Work Type: Distribution Pipeline
Location: Alberta
Contract Type: UPC
Owner: Atco Gas
Role: General Contractor
Status: Completed