Installation of approximately 20.8km of NPS 20 and 2km of NPS 12 in the South West Edmonton Transportation Utility Corridor (TUC). The pipelinewas installed within a 10m ROW with 20m adjacent work space. There were numerous HDD crossings including the North Saskatchewan River, White Mud Creek and the Anthony Henday at multiple locations.
Pipeline
South West Edmonton Connector
Project Information
Client: ATCO Pipelines
Job Number: 16015
Work Type: Mainlnie Pipeline
Location: Alberta
Contract Type: Lump Sum
Owner: ATCO Pipelines
Role: General