Pipeline

Steel Mains Replacement (SMR) - Balwin

Project Information

Client: ATCO Gas
Job Number: 15508
Work Type: Distribution Pipeline
Location: Alberta
Contract Type: Unit Price
Owner: ATCO Gas
Role: Prime Contractor
Status: Completed
Download PDF
Project is to replace existing steel mains and services in the Balwin area of Edmonton. Area is primarily residential with some commercial buildings. Project involves installation of 1,200m of PE mains up to 2", 550m of PE mains between 3" and 4", 100m of 6" PE mains, and 129 services. New mains and services will primarily be installed by directional drilling. Also involved with the replacement of service lines is to move any existing inside gas meter to the outside of the building. Inside gas meter work will consist of primarily residential houses with 200 series meters, and commercial meters up to 2M rotary meters.