Project is to replace existing steel mains and services in the Holyrood area of Edmonton. Area is residential only. Project involves installation of 1,900m of PE mains up to 2", and 156 services. New mains and services will primarily be installed by directional drilling. Also involved with the replacement of service lines is to move any existing inside gas meter to the outside of the building. Inside gas meter work will consist of primarily residential houses with 200 series meters.
Pipeline
Steel Mains Replacement (SMR) - Holyrood
Project Information
Client: ATCO Gas
Job Number: 14504
Work Type: Distribution Pipeline
Location: Alberta
Contract Type: Unit Price
Owner: ATCO Gas
Role: Prime Contractor
Status: Completed