Project scope includes the hydrostatic testing three sections of NPS42 totaling approximately 44.4km. This project includes the pre-test isolation and re-instatement of sales taps along with excavation, welding and coating. Project water source was 5.5km away from the fill point requiring pumping water over 5.5km and installation of 3 C-Rings.