Scope included hydrostatic testing of 5 sections of approximately 60km on the NPS 10 Saddle Lake Lateral between St. Paul, AB and Bonnyville, AB. Each section ranged from 8.5km to 15.9km in length.
Pipeline
TC NPS 10 Saddle Lake Hydrotest Project
Project Information
Client: TC Energy
Job Number: 20003
Work Type: Integrity & Maintenance
Location: Alberta
Contract Type: Cost Plus
Owner: TC Energy
Role: Prime Contractor
Status: Completed