Project Information

Client: TC Energy
Job Number: 20003
Work Type: Integrity & Maintenance
Location: Alberta
Contract Type: Cost Plus
Owner: TC Energy
Role: Prime Contractor
Status: Completed
Download PDF
Scope included hydrostatic testing of 5 sections of approximately 60km on the NPS 10 Saddle Lake Lateral between St. Paul, AB and Bonnyville, AB. Each section ranged from 8.5km to 15.9km in length.