Pipeline

TransCanada Pipelines - Fort McKay Class Upgrade

Project Information

Client: TransCanada Pipelines
Job Number: 17012
Work Type: Integrity & Maintenance
Location: Alberta
Contract Type: Cost Plus
Owner: TransCanada Pipelines
Role: Pipeline
Status: Complete
Download PDF
This project involved the replacement of approximately 140m of NPS 30 and the installation of a NPS 30 valve near Fort MacKay, Alberta. The class upgrade portion of this project involved the installation a 24" stopple by pass to allow NPS 30 class upgrade to proceed without interrupting the flow of gas. In addition, a NPS 30 main line block valve approximately 1.5km away from the class upgrade was installed with an additional 24" stopple by pass.