This project required the replacement of 24" pipeline under Hwy 15 in Mirabel, Quebec. The pipeline was to remain operational at all times so a stopple and 24" bypass arrangement was required. An approximate 250m HDD was required to install the pipeline under Hwy 15. The existing pipeline was removed from its casing under the highway and the casing grouted.