Pipeline

Trout Lake Riser Replacement

Project Information

Client: TC Energy
Job Number: 22395
Work Type: Integrity & Maintenance
Location: North Bay
Contract Type: Cost Plus
Owner: TC Energy
Role: Prime Contractor
Status: Complete
Duration: 2022-09-01T04:00:00.0000000Z2022-10-21T04:00:00.0000000Z

Trout Lake SMS Upgrade Project included modifications to an existing sales meter station. The Trout Lake SMS building was isolated, disconnected and removed. Piles and structural steel were installed to support the building which was previously sitting on the ground. Also the 3" risers feeding the building on each end are corroded and required replacement.