The scope for this project included the installation of approximately 19km of NPS 20 for the Urban Pipeline Replacement Project - West Calgary Connector. The pipeline will be installed generally within a 19km ROW with 20m adjacent work space. There are numerous HDD crossings at multiple locations for rivers, highways, streets and a drainage pond.